Meet Hai Duong Department of Planning & Investment (DPI)  (2)
Obtain certified copies of foreign documents  (2)
Obtain consular legalized copies of foreign documents  (3)
Obtain certified translation of documents  (2)
Obtain authenticated copies of Passport and/or Vietnamese ID cards  (2)
Obtain Functional Authorities's permission and Investment Certificate  (2)
Obtain authenticated copies of Investment Certificate.  (2)
Making seal  (2)
16
Make seal
Obtain Enterprise Registration Certificate (ERC)  (2)
Open bank account  (1)
Publish in newspaper  (1)
Obtain announcement on land measuring and setting up land recovery profile  (2)
Obtain Decision on approval of compensation and resettlement plan and land recovery  (5)
Pay compensation and support amounts  (1)
Obtain Decision on land recovery and land lease  (2)
Attend on-site title plan verification  (1)
Sign Land lease contract  (1)
Obtain Land use right Certificate and assets attached on land  (3)
Obtain approval of Environment Impact Assessment report (EIA)  (6)
Obtain approval of fire prevention and fighting  (3)
Obtain approval of detail construction planning (the Master site)  (3)
Obtain Construction permit  (3)

Preview & Print

Properties
 
49
Prepare dossier for Construction permit
(last modified: 6/21/2015)

Costs

( ver detalles )

Timeframe ( ver detalles )

Espera hasta paso siguiente

VND 10000000
20 mn  -  30 mn
10 days  -  15 days

Expected results

Approval paper of investor on technical design and construction drawings. 01 - Approval paper of investor on technical design and construction drawings.
Report on the result of technical design and construction drawings 01 - Report on the result of technical design and construction drawings
Maps of some main bearing structures 01 - Maps of some main bearing structures
The Master Plan drawing of the project or each stage of the project, ratio 1/100 - 1/500 01 - The Master Plan drawing of the project or each stage of the project, ratio 1/100 - 1/500
The plan drawing of each work on the land plot, ratio 1/100 - 1/500 & map of the work location 01 - The plan drawing of each work on the land plot, ratio 1/100 - 1/500 & map of the work location
Drawing of main vertical and horizontal sides of each work, ratio 1/50 - 1/200 01 - Drawing of main vertical and horizontal sides of each work, ratio 1/50 - 1/200
Drawing of each work's foundation, ratio 1/100-1/200 and its horizontal side, ratio 1/50 01 - Drawing of each work's foundation, ratio 1/100-1/200 and its horizontal side, ratio 1/50
The connecting map to technical system, ratio 1/50 - 1/200 01 - The connecting map to technical system, ratio 1/50 - 1/200
Approval paper of investor on Constructing methods Approval paper of investor on Constructing methods
Practicing certificate of Designers and Design's Directors. 01 - Practicing certificate of Designers and Design's Directors.
Business registration of Design consultancy, Building survey contractor 01 - Business registration of Design consultancy, Building survey contractor
Report of capacities and experiences of Designer and Design Organizations Report of capacities and experiences of Designer and Design Organizations

Requirements

1. 01 - Libre deuda de patente
Investment registration certificate (IRC) (Simple copy)
2. 01 - Libre deuda de patente
Investment Project (Simple copy)
(This dossier include all documents investors submited to Hai Duong's DPI before. Those documents need to be put into one file, and we call this is "Investment Project")
3. 01 - Libre deuda de patente
Land Use Right Certificate and assets attached on land (Simple copy)

Costs

Cost detail

Hypothesis

VND  10,000,000 per contract / transaction amount
- VND 10,000,000
1
The cost of preparing dossiers depends on the price - level of each Consultant Company and agreement of both parties but normally it is from 10 to 15 million VND.

Time frame

Waiting time in queue: Min. 10mn - Max. 15mn
Attention at counter: Min. 10mn - Max. 15mn
Waiting time until next step: Min. 10 days - Max. 15 days

Legal justification

1. Law on Construction No.50/2014/QH13 dated 18/6/2014 of National Assembly.
Law on Construction No.50/2014/QH13 dated 18/6/2014 of National Assembly.
articles 14, 52, 53, 54, 56, 58
2. Law No.38/2009/QH12 dated 19/06/2009 of the National Assembly on amendment, supplement some articles related to construction
Law No.38/2009/QH12 dated 19/06/2009 of the National Assembly on amendment, supplement some articles related to construction
Article 1.1
3. Decree No.12/2009/ND-CP dated 10/02/2009 of the Government on managing investment project of Construction building
Decree No.12/2009/ND-CP dated 10/02/2009 of the Government on managing investment project of Construction building
articles 36, 37, 41, 42, 44, 45, 46, 47, 48, 49
4. Decree No.15/2013/ND-CP dated 6/02/2013 of the Government on management of construction's quality
Decree No.15/2013/ND-CP dated 6/02/2013 of the Government on management of construction's quality
articles 13, 15, 18, 19

Additional information

To prepare dossier and necessary documents, investors can contact to any Construction Consultant Company for request of preparing dossiers on behalf of investor.