List of steps
(Total number of steps: 51)
Meet Hai Duong Department of Planning & Investment (DPI)
Obtain certified copies of foreign documents  (2)
Obtain consular legalized copies of foreign documents  (3)
Obtain certified translation of documents  (2)
Obtain authenticated copies of Passport and/or Vietnamese ID cards  (2)
Obtain sectional cadastral map of the land plot estimated to lease  (2)
Obtain announcement of approval on investment intent and location  (4)
Obtain Investment Certificate  (1)
Obtain authenticated copies of Investment Certificate.  (2)
Obtain Enterprise Registration Certificate (ERC)  (2)
Making seal  (2)
21
Make seal
Open bank account  (1)
Publish in newspaper  (1)
Obtain announcement on land measuring and setting up land recovery profile  (2)
Obtain compensation, support and resettlement plan and related documents  (2)
Obtain Decision of approval on compensation, support and resettlement plan and land recovery  (2)
Pay compensation and support amount  (1)
Attend on-site title plan verification  (1)
Sign Land lease contract  (1)
Obtain Land use right Certificate and assets attached on land  (3)
Obtain approval of Environment Impact Assessment report (EIA)  (6)
Obtain approval of fire prevention and fighting  (3)
Obtain approval of detail construction planning (the Master site)  (3)
Obtain Construction permit  (3)

Preview & Print

Properties
 
50
Submit application for Construction permit
(last modified: 6/24/2015)

Timeframe ( ver detalles )

Espera hasta paso siguiente

10 mn  -  30 mn
10 days  -  15 days

Contact details

Entity in charge

Hai Duong Department of Construction

No. 5 Thanh Nien Street, Tran Hung Dao District , Hai Duong
Tel: +84 3203 853 882

Unit in charge

One door unit

Mon: 07:30-11:30, 13:30-16:30
Tue: 07:30-11:30, 13:30-16:30
Wed: 07:30-11:30, 13:30-16:30
Thu: 07:30-11:30, 13:30-16:30
Fri: 07:30-11:30, 13:30-16:30

Person in charge

Mr Pham Van Quyet

Vice Chief of One Door Unit
Tel: +84 948 589 775, +84 3203 853 882
Email: quyetkt2008@gmail.com

Expected results

Receipt of Construction Permit application 01 - Receipt of Construction Permit application

Requirements

A. General requirements:
01 set of dossiers of below documents:
1. Application for issuing Construction permit
Application for issuing Construction permit (original)
2. 01 - Libre deuda de patente
Land Use Right Certificate and assets attached on land (Simple copy)
3. 01 - Libre deuda de patente
Investment registration certificate (IRC) (an authentic copy)
4. 01 - Libre deuda de patente
Enterprise registration certificate (ERC) (Simple copy)
5. 01 - Libre deuda de patente
Investment Project (Simple copy)
(This dossier include all documents investors submited to Hai Duong's DPI before. Those documents need to be put into one file, and we call this is "Investment Project")
and 02 set of Conceptual drawings profile, each includes:
1. 01 - Libre deuda de patente
The Master Plan drawing of the project or each stage of the project, ratio 1/100 - 1/500 (original)
2. 01 - Libre deuda de patente
The plan drawing of each work on the land plot, ratio 1/100 - 1/500 & map of the work location (original)
3. 01 - Libre deuda de patente
Drawing of main vertical and horizontal sides of each work, ratio 1/50 - 1/200 (original)
4. 01 - Libre deuda de patente
Drawing of each work's foundation, ratio 1/100-1/200 and its horizontal side, ratio 1/50 (original)
5. 01 - Libre deuda de patente
The connecting map to technical system, ratio 1/50 - 1/200 (original)
(such as: rain water drainage, waste water treatment, water & electric supply and communication)
B. Depends on construction location, scale, characteristic of the work, supplement:
1. 01 - Libre deuda de patente
Map of fire preventing & fighting system ratio 1/50 - 1/200 (original)
2. 01 - Libre deuda de patente
Approval paper of investor on technical design and construction drawings. (original)
(In detail, see addtional information)
3. 01 - Libre deuda de patente
Report on the result of technical design and construction drawings (original)
(implemented by State management Organs on Construction or Consultancy Organizations which have fully capacity as regulated by Laws (In detail, see additional information)
4. 01 - Libre deuda de patente
Maps of some main bearing structures (original)
(signed & sealed by Designer and Design Organization)
5. 01 - Libre deuda de patente
Decision of approval on Detail construction planning (the Master site) (Simple copy)
6. Approval paper of investor on Constructing methods
Approval paper of investor on Constructing methods (original)
(to ensure the safety for the work and neighbour works)
7. List of capacities and experiences of Designer and Design Organizations
List of capacities and experiences of Designer and Design Organizations (original)
8. 01 - Libre deuda de patente
Business registration of Design consultancy, Building survey contractor (an authentic copy)
9. 01 - Libre deuda de patente
Practicing certificate of Designers and Design's Directors. (an authentic copy)

Time frame

Processing time normally is 10 to 15 working days after receiving a full set of dossiers.
Waiting time in queue: Min. 5mn - Max. 15mn
Attention at counter: Min. 5mn - Max. 15mn
Waiting time until next step: Min. 10 days - Max. 15 days

Legal justification

1. Law on Construction No.50/2014/QH13 dated 18/6/2014 of National Assembly.
Law on Construction No.50/2014/QH13 dated 18/6/2014 of National Assembly.
articles 4, 6, 13, 62, 63, 64, 65, 68
2. Decree No.15/2013/ND-CP dated 6/02/2013 of the Government on management of construction's quality
Decree No.15/2013/ND-CP dated 6/02/2013 of the Government on management of construction's quality
articles 3, 13, 14, 15, 18, 19
3. Circular No.10/2012/TT-BXD dated 20/12/2012 of Ministry of Construction guiding some contents of Decree No.64/2012/ND-CP dated 4/9/2012 of the Government on issuing Construction Permit.
Circular No.10/2012/TT-BXD dated 20/12/2012 of Ministry of Construction guiding some contents of Decree No.64/2012/ND-CP dated 4/9/2012 of the Government on issuing Construction Permit.
articles 1, 2, 3, 5, 10, 11
4. Circular No.10/2013/TT-BXD dated 25/7/2013 of Ministry of Construction regulating detail some contents of managing construction's quality
Circular No.10/2013/TT-BXD dated 25/7/2013 of Ministry of Construction regulating detail some contents of managing construction's quality
articles 2, 3, 4, 5
5. Circular No.13/2013/TT-BXD dated 15/8/2013 of Ministry of Construction regulating on investigating and approving construction's design
Circular No.13/2013/TT-BXD dated 15/8/2013 of Ministry of Construction regulating on investigating and approving construction's design
articles 3, 4, 5

Additional information

All report and decision on the investigating result of technical or construction drawing design, design investigation of investor, State management Organs on Construction or Consultant Organizations are implemented as regulated at:
- Decree No.15/2013/ND-CP dated 6/02/2013 of the Government on management of construction's quality.
- Circular No.10/2013/TT-BXD dated 25/7/2013 of Ministry of Construction regulating some of the contents of managing construction's quality
- Circular No.13/2013/TT-BXD dated 15/8/2013 of Ministry of Construction regulating investigating and approving construction's design.

Recourse: Hai Duong Department of Construction

Entity in charge

Hai Duong Department of Construction

No. 5 Thanh Nien Street, Tran Hung Dao District , Hai Duong
Tel: +84 3203 853 882

Unit in charge

One door unit

Mon: 07:30-11:30, 13:30-16:30
Tue: 07:30-11:30, 13:30-16:30
Wed: 07:30-11:30, 13:30-16:30
Thu: 07:30-11:30, 13:30-16:30
Fri: 07:30-11:30, 13:30-16:30

Person in charge

Mr Nguyen Xuan Quan

Chief of One door unit
Tel: +84 912 282 995, +84 3203 853 882