List of steps
(Total number of steps: 45)
Meet Hai Duong Department of Planning & Investment (DPI)
Obtain certified copies of foreign documents  (2)
Obtain consular legalized copies of foreign documents  (3)
Obtain certified translation of documents  (2)
Sign the Land transfered Contract  (1)
Obtain authenticated copies of Passport and/or Vietnamese ID cards  (2)
Obtain announcement of approval on investment intent and location  (2)
Obtain Investment Certificate  (1)
Obtain authenticated copies of Investment Certificate.  (2)
Obtain Enterprise Registration Certificate (ERC)  (2)
Making seal  (2)
18
Make seal
Open bank account  (1)
Publish in newspaper  (1)
Obtain Decision on land recovery and lease  (2)
Complete financial responsibilities (if any)  (2)
Attend on-site title plan verification  (1)
Obtain Certificate of land use right and assets attached on land  (4)
Obtain fire prevention and fighting Certificate  (3)
Obtain Decision on approval of Environment Impact Assessment report (EIA)  (6)
Obtain Decision on approval of detail construction planning (the Master site)  (3)
Obtain Construction Permit  (3)

Preview & Print

Properties
 
43
Prepare dossier for Construction Permit
(last modified: 6/21/2015)

Expected results

Approval paper of investor on technical or construction drawing design 01 - Approval paper of investor on technical or construction drawing design
Report on the result of technical design and construction drawings 01 - Report on the result of technical design and construction drawings
Maps of some main bearing structures 01 - Maps of some main bearing structures
Report of capacities and experiences of Designer and Design Organizations Report of capacities and experiences of Designer and Design Organizations
Business registration of Design consultancy, Building survey contractor 01 - Business registration of Design consultancy, Building survey contractor
Practicing certificate of Designers and Design's Directors. 01 - Practicing certificate of Designers and Design's Directors.
The Master Plan drawing of the project or each stage of the project, ratio 1/100 - 1/500 01 - The Master Plan drawing of the project or each stage of the project, ratio 1/100 - 1/500
The plan drawing of each work on the land plot, ratio 1/100 - 1/500 & map of the work location 01 - The plan drawing of each work on the land plot, ratio 1/100 - 1/500 & map of the work location
Drawing of main vertical and horizontal sides of each work, ratio 1/50 - 1/200 01 - Drawing of main vertical and horizontal sides of each work, ratio 1/50 - 1/200
Drawing of each work's foundation, ratio 1/100-1/200 and its horizontal side, ratio 1/50 01 - Drawing of each work's foundation, ratio 1/100-1/200 and its horizontal side, ratio 1/50
The connecting map to technical system, ratio 1/50 - 1/200 01 - The connecting map to technical system, ratio 1/50 - 1/200
Approval paper of investor on Constructing methods Approval paper of investor on Constructing methods
Report of investor on the investigating result of technical or construction drawing design Report of investor on the investigating result of technical or construction drawing design

Requirements

1. 01 - Libre deuda de patente
Investment Certificate (an authentic copy)
2. 01 - Libre deuda de patente
Investment Project (Simple copy)
(This dossier include all documents investors submited to Hai Duong's DPI before. Those documents need to be put into one file, and we call this is "Investment Project")
3. 01 - Libre deuda de patente
Land use right Certificate and assets attached on land (Simple copy)

Costs

Cost detail

Hypothesis

VND  10,000,000 per contract / transaction amount
- VND 10,000,000
1
The cost of preparing dossiers depends on the price - level of each Consultant Company and agreement of both parties but normally it is from 10 to 15 million VND.

Time frame

Time for preparing dossier depends on the complexity of each project and each Consultant Company, however normally it takes from 15 to 25 working days to complete the dossier.
Waiting time in queue: Min. 5mn - Max. 15mn
Attention at counter: Min. 5mn - Max. 15mn

Legal justification

1. Law on Construction No.50/2014/QH13 dated 18/6/2014 of National Assembly.
Law on Construction No.50/2014/QH13 dated 18/6/2014 of National Assembly.
articles 14, 52, 53, 54, 56, 58
2. Law No.38/2009/QH12 dated 19/06/2009 of the National Assembly on amendment, supplement some articles related to construction
Law No.38/2009/QH12 dated 19/06/2009 of the National Assembly on amendment, supplement some articles related to construction
Article 1.1
3. Decree No.12/2009/ND-CP dated 10/02/2009 of the Government on managing investment project of Construction building
Decree No.12/2009/ND-CP dated 10/02/2009 of the Government on managing investment project of Construction building
articles 36, 37, 41, 42, 44, 45, 46, 47, 48, 49
4. Decree No.15/2013/ND-CP dated 6/02/2013 of the Government on management of construction's quality
Decree No.15/2013/ND-CP dated 6/02/2013 of the Government on management of construction's quality
articles 13, 15, 18, 19

Additional information

To prepare dossier and necessary documents, investors can contact to any Construction Consultant Company for request of preparing dossiers on behalf of investor.